Perforating the sump
container will be necessary if no interior footing drain is installed
in the 4 inch rock sub-grade.
If the footing is wider
than the HYDRO CHANNEL for stretches over 30 feet, a separate
2 foot piece with the channel cut off needs to be installed at
elast every 20 feet to create at least a 2 inch overlap onto the
rock sub-grade (example F).
|